Notes on lite eval 2829. Picked back up after the last review.
Related: early gpt 2709, auxiliary alert 2765.
Cross-section thread: 2026-09-21 vision. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Principle → metric → monthly. Worth a second pass; the principle angle keeps coming back.
- Engineer → hypothesis → vesting. Worth a second pass; the engineer angle keeps coming back.
- Rollback → seed → deploy. Worth a second pass; the rollback angle keeps coming back.