Notes on 2025-05-13 engineer. Picked back up after the last review.
Related: 2026-09-01 inference, 2025-05-01 warm intro.
Cross-section thread: confirmed warm intro 6792. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Value → doc → process. Worth a second pass; the value angle keeps coming back.
- Rollback → objection → rerank. Worth a second pass; the rollback angle keeps coming back.
Decisions: shipped the feature flag, rolled back the SLO tweak, queued the postmortem for next week.