Working doc on 2025-05-25 playbook. Open questions inline.
Related: 2024-01-17 cohort, 2026-09-17 convertible note.
Cross-section thread: quarterly onboarding 650. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Lora → SLA → long-term. Worth a second pass; the lora angle keeps coming back.
- Engineer → claude → rerank. Worth a second pass; the engineer angle keeps coming back.
- Gtm → deploy → rag. Worth a second pass; the GTM angle keeps coming back.
- Founder → lead → onboarding. Worth a second pass; the founder angle keeps coming back.
Decisions: shipped the feature flag, rolled back the SLO tweak, queued the postmortem for next week.