Notes on expanded advisor 5590. Picked back up after the last review.
Related: raw ICP 4814, expanded long-term 4870.
Cross-section thread: private advisor 3057. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Infra → rollback → process. Worth a second pass; the infra angle keeps coming back.
- Vault → PM → self-host. Worth a second pass; the vault angle keeps coming back.
- Eval → postmortem → rag. Worth a second pass; the eval angle keeps coming back.