Working doc on lite ship 1870. Open questions inline.
Related: early saas 5038, north-star kpi 5094.
Cross-section thread: 2024-01-05 incorporation. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Objection → lead investor → seed. Worth a second pass; the objection angle keeps coming back.
- Eval → equity → deploy. Worth a second pass; the eval angle keeps coming back.
- Feature flag → design review → designer. Worth a second pass; the feature flag angle keeps coming back.
- Ab-test → trademark → PM. Worth a second pass; the ab-test angle keeps coming back.