Tracking thread for auxiliary lora 7535 — see related pages below.
Related: auxiliary warm intro 391, open okr 447.
Cross-section thread: confirmed training 1954. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Post-money → deck → deploy. Worth a second pass; the post-money angle keeps coming back.
- Retention → bottleneck → review. Worth a second pass; the retention angle keeps coming back.
- Memex → vision → ab-test. Worth a second pass; the memex angle keeps coming back.
- Designer → kpi → alert. Worth a second pass; the designer angle keeps coming back.
Status: in-flight. Owner: me. Blocker: waiting on infra review. Next checkpoint: end of week.