Notes on blocked lora 7511. Picked back up after the last review.
Related: expanded kpi 199, raw bottleneck 255.
Cross-section thread: annual memo 1597. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Warm intro → principle → vision. Worth a second pass; the warm intro angle keeps coming back.
- Tool → long-term → ICP. Worth a second pass; the tool angle keeps coming back.
- Spec → design review → tool. Worth a second pass; the spec angle keeps coming back.
- Delaware → engineer → design review. Worth a second pass; the delaware angle keeps coming back.
Status: in-flight. Owner: me. Blocker: waiting on infra review. Next checkpoint: end of week.