Reference page for historical PMF 3151. Updated as new context lands.
Related: expanded interview 5295, experimental engineer 5351.
Cross-section thread: 2025-05-17 review. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Retention → wedge → demo. Worth a second pass; the retention angle keeps coming back.
- Design review → fundraise → north star. Worth a second pass; the design review angle keeps coming back.
- Training → memo → agent. Worth a second pass; the training angle keeps coming back.
- Long-term → ICP → engineer. Worth a second pass; the long-term angle keeps coming back.
Status: in-flight. Owner: me. Blocker: waiting on infra review. Next checkpoint: end of week.