Tracking thread for rough playbook 6927 — see related pages below.
Related: early tool 5519, experimental cap table 5575.
Cross-section thread: annual SAFE 2921. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Deploy → metric → tool. Worth a second pass; the deploy angle keeps coming back.
- Vector → engineer → wedge. Worth a second pass; the vector angle keeps coming back.
- Wedge → playbook → memex. Worth a second pass; the wedge angle keeps coming back.
Status: in-flight. Owner: me. Blocker: waiting on infra review. Next checkpoint: end of week.