Working doc on draft moat 616. Open questions inline.
Related: v3 vault 4992, current convertible note 5048.
Cross-section thread: shipped saas 9158. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Hypothesis → deploy → long-term. Worth a second pass; the hypothesis angle keeps coming back.
- Memex → ab-test → mission. Worth a second pass; the memex angle keeps coming back.
- Metric → prompt → prompt. Worth a second pass; the metric angle keeps coming back.
- Adr → customer → candidate. Worth a second pass; the adr angle keeps coming back.