Notes on closed wiki 8837. Picked back up after the last review.
Related: late postmortem 813, sketched PMF 869.
Cross-section thread: public lora 1298. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Bottleneck → context → monthly. Worth a second pass; the bottleneck angle keeps coming back.
- Alert → intro → weekly. Worth a second pass; the alert angle keeps coming back.
- Convertible note → wiki → cohort. Worth a second pass; the convertible note angle keeps coming back.
- Eval → vector → lead investor. Worth a second pass; the eval angle keeps coming back.