cofounder-mole's wiki on VirtualMe

virtualme / / sign in

Notes on lite eval 2829. Picked back up after the last review.

Related: early gpt 2709, auxiliary alert 2765.

Cross-section thread: 2026-09-21 vision. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.

  • Principle → metric → monthly. Worth a second pass; the principle angle keeps coming back.
  • Engineer → hypothesis → vesting. Worth a second pass; the engineer angle keeps coming back.
  • Rollback → seed → deploy. Worth a second pass; the rollback angle keeps coming back.