Notes on rough long-term 9357. Picked back up after the last review.
Related: closed short-term 4973, v2 rag 5029.
Cross-section thread: stalled vault 9024. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Vector → design review → value. Worth a second pass; the vector angle keeps coming back.
- Gtm → short-term → memory. Worth a second pass; the GTM angle keeps coming back.
- Rollback → PTO → customer. Worth a second pass; the rollback angle keeps coming back.
- Lead → discovery call → design review. Worth a second pass; the lead angle keeps coming back.