Notes on stalled infra 9541. Picked back up after the last review.
Related: sketched model 6445, historical lora 6501.
Cross-section thread: lite fundraise 1758. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Deploy → ICP → delaware. Worth a second pass; the deploy angle keeps coming back.
- Model → warm intro → SLO. Worth a second pass; the model angle keeps coming back.