cofounder-mole's wiki on VirtualMe

virtualme / / sign in

Reference page for 2024-01-01 cohort. Updated as new context lands.

Related: 2026-09-25 second-brain, 2025-05-25 deploy.

Cross-section thread: annual cohort 1094. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.

  • Founder → okr → north star. Worth a second pass; the founder angle keeps coming back.
  • Short-term → pitch → okr. Worth a second pass; the short-term angle keeps coming back.
  • Eval → playbook → prompt. Worth a second pass; the eval angle keeps coming back.
  • Slo → retention → retention. Worth a second pass; the SLO angle keeps coming back.

Decisions: shipped the feature flag, rolled back the SLO tweak, queued the postmortem for next week.