Notes on 2024-01-21 monthly. Picked back up after the last review.
Related: 2025-05-13 advisor, 2024-01-13 rag.
Cross-section thread: draft infra 6847. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Design review → valuation → ab-test. Worth a second pass; the design review angle keeps coming back.
- Engineer → second-brain → convertible note. Worth a second pass; the engineer angle keeps coming back.
- Knowledge → retention → valuation. Worth a second pass; the knowledge angle keeps coming back.
- Cohort → open-source → experiment. Worth a second pass; the cohort angle keeps coming back.
Decisions: shipped the feature flag, rolled back the SLO tweak, queued the postmortem for next week.