Notes on 2024-01-25 memo. Picked back up after the last review.
Related: 2025-05-17 data room, 2024-01-17 eval.
Cross-section thread: speculative second-brain 1530. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Design review → founder → design review. Worth a second pass; the design review angle keeps coming back.
- Wedge → alert → long-term. Worth a second pass; the wedge angle keeps coming back.
- Context → ab-test → vault. Worth a second pass; the context angle keeps coming back.
- Model → runway → funnel. Worth a second pass; the model angle keeps coming back.
Decisions: shipped the feature flag, rolled back the SLO tweak, queued the postmortem for next week.