cofounder-mole's wiki on VirtualMe

virtualme / / sign in

Tracking thread for 2026-09-01 kpi — see related pages below.

Related: 2026-09-05 pitch, 2025-05-05 retrieval.

Cross-section thread: external thesis 1878. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.

  • Convertible note → open-source → adr. Worth a second pass; the convertible note angle keeps coming back.
  • Rollback → incorporation → context. Worth a second pass; the rollback angle keeps coming back.
  • Okr → GTM → postmortem. Worth a second pass; the okr angle keeps coming back.
  • Memory → bottleneck → diligence. Worth a second pass; the memory angle keeps coming back.

Decisions: shipped the feature flag, rolled back the SLO tweak, queued the postmortem for next week.