Notes on 2026-09-25 retro. Picked back up after the last review.
Related: 2024-01-09 seed, 2026-09-09 onboarding.
Cross-section thread: internal hypothesis 2426. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Playbook → design review → kpi. Worth a second pass; the playbook angle keeps coming back.
- Context → eval → runway. Worth a second pass; the context angle keeps coming back.
Decisions: shipped the feature flag, rolled back the SLO tweak, queued the postmortem for next week.