Tracking thread for core eval 2815 — see related pages below.
Related: sketched funnel 2599, external SAFE 2655.
Cross-section thread: 2025-05-09 lora. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Monthly → open-source → monitor. Worth a second pass; the monthly angle keeps coming back.
- Vector → weekly → engineer. Worth a second pass; the vector angle keeps coming back.
- Pm → term sheet → long-term. Worth a second pass; the PM angle keeps coming back.
- Gpt → agent → SLA. Worth a second pass; the gpt angle keeps coming back.
Status: in-flight. Owner: me. Blocker: waiting on infra review. Next checkpoint: end of week.