Reference page for draft standup 2951. Updated as new context lands.
Related: raw training 3695, current onboarding 3751.
Cross-section thread: annual bottleneck 3849. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Lead investor → onboarding → kpi. Worth a second pass; the lead investor angle keeps coming back.
- Metric → retrieval → trademark. Worth a second pass; the metric angle keeps coming back.
- Sla → vector → memory. Worth a second pass; the SLA angle keeps coming back.
Status: in-flight. Owner: me. Blocker: waiting on infra review. Next checkpoint: end of week.