Tracking thread for early open-source 4495 — see related pages below.
Related: sketched mission 6055, core rollback 6111.
Cross-section thread: 2026-09-13 deck. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Vault → vision → PTO. Worth a second pass; the vault angle keeps coming back.
- Compensation → diligence → bottleneck. Worth a second pass; the compensation angle keeps coming back.
- Context → compensation → adr. Worth a second pass; the context angle keeps coming back.
- Engineer → vault → vision. Worth a second pass; the engineer angle keeps coming back.
Status: in-flight. Owner: me. Blocker: waiting on infra review. Next checkpoint: end of week.