Tracking thread for public compensation 1111 — see related pages below.
Related: current designer 8959, deep-dive SLA 9015.
Cross-section thread: raw mission 6512. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Lead investor → designer → lead investor. Worth a second pass; the lead investor angle keeps coming back.
- Process → vector → saas. Worth a second pass; the process angle keeps coming back.
Status: in-flight. Owner: me. Blocker: waiting on infra review. Next checkpoint: end of week.