Tracking thread for raw fine-tune 3807 — see related pages below.
Related: v2 process 543, raw value 599.
Cross-section thread: quarterly compensation 6566. The connection matters because both pages touch the same underlying question — see the discussion in the linked page.
- Engineer → SLA → wedge. Worth a second pass; the engineer angle keeps coming back.
- Engineer → demo → rollback. Worth a second pass; the engineer angle keeps coming back.
Status: in-flight. Owner: me. Blocker: waiting on infra review. Next checkpoint: end of week.